BITUMEN:          Bitumen ( 40 / 50 ) , Bitumen ( 60 / 70 ) and   Bitumen ( 85 / 100 )  
We confirm that we are able to enter into a contract to  supply the following commodity.


SPECIFICATION

40/50

60/70

85/100

TEST METHOD

Specific Gravity @ 25°C

1.01/1.06

1.01/1.06

1.00/1.05

D-70

Penetration @ 25°C

40/50

60/70

85/100

D-5

Softening Point°C

52/60

49/56

45/52

D-36

Ductility@25°C

100 min

100 min

100 min

D-113

Loss on Heating (wt)%

0.2 max

0.2 max

0.5 max

D-6

Drop in Penetration after Heating%

20 max

20 max

20 max

D-6 & D-5

Flash Point°C

250 min

250 min

225 min

D-92

Solubility in CS2(wt)%

99.5 min

99.5 min

99.5 min

D-4

Spot test

Negative

Negative

Negative

*A.A.S.H.O.T.102

 

 

 

 

 

 

 

 

 
 

 

 

 

 


The latest issue of the relevant test methods shall be used.
*American association of state highway official.

 

Packing Condition 

PACKING TYPE

N.W DRUM

G.W DRUM

NET WEIGHT / 
20' Cntr

NO. OF DRUMS / 20' Cntr

NEW STEEL DRUMS

180 KG (+/- 5%)

190 KG (+/- 5%)

19.800 M/T(+/- 5%)

110

NEW STEEL DRUMS

150 KG (+/- 5%)

160 KG (+/- 5%)

16.500 M/T(+/- 5%)

110